
Carried out in: Malawi
Tax Included
Book now — get 100% of campaign code 102
Complete mosque construction, finishing, and furnishing, ready to welcome worshippers.
Choose from three mosque sizes: 100, 150, or 225 m².
We handle the project from foundations through finishing, furnishing, and equipping the facilities, with personalised construction updates featuring your name.
These figures are estimates.
✔ Purchase of the mosque land.
✔ Brick construction.
✔ Finishing and furnishing.
✔ A minaret.
✔ An outer sheet metal roof and an internal suspended ceiling.
✔ A mosque sound system.
✔ Doors and iron-framed windows.
✔ An ablution (wudu) area and toilets.
✔ A water source: a hand-pump well or a water tank.
3 videos featuring your name:
Prices for optional extras are in addition to the cost of your chosen mosque. Extras are booked and invoiced separately after your mosque booking.
1. Solar Power System
To provide electricity where no power supply is available at the site. $650
2. An Imam for One Year
Appointing an imam and overseeing his work for 12 months. $1,500
3. Classroom Construction
A 30 m² classroom for teaching the Qur’an and Islamic creed (Aqeedah). $5,700
Words That Embody Trust
Trust Continues with Your Presence
Yes. We adhere to Islamic requirements in slaughter, timing, naming, and method of execution.
Yes, documentation includes all stages as if you were with us. Aqiqah/Vows/Charity: slaughter video in your name + kitchen, preparation and distribution video + photos. Umrah Badal: video of all Umrah rituals from start to finish. Wells and water connections: execution documentation + beneficiary family data after execution.
Documentation reaches you within 24 hours. At busy times or in emergencies: within 48 hours at most.
When a complete well is booked, the execution and operational costs are consolidated into a single order. This means that follow-up, preparation, documentation, labor, and transportation costs are incurred only once. With the shared contribution system, however, these costs are repeated separately for each contributor. For example, documenting and inaugurating a shared well may require a full working day, additional staff, extra transportation costs, as well as separate printing, filming, and detailed documentation for each contributor. As a result, part of the value of each share goes toward operational costs that do not recur when a complete well is booked. Therefore, if you are able to book a complete well, you receive greater value for the amount paid, as you avoid repeated operational costs associated with multiple contributors and benefit from a more cost-effective total price for completing the entire well.